What does process automation cost? Factors, process and funding options

There is no responsible flat rate for process automation — the projects behind them are too different. What actually drives the effort, how you get a concrete quote and which subsidies are available in Austria.

Proposal upon request3 to 6 weeksAs of 2026
In short

A flat rate for process automation cannot be quoted responsibly — it depends on the scope of the project, not on the provider. Per workflow; typical projects include three to five workflows. The actual proposal comes only after a brief, no-obligation initial consultation.

01 — Price

What it costs

Price
Individual based on effort
Typical duration
3 to 6 weeks

Per workflow; typical projects include three to five workflows. A fixed price can only be quoted seriously after the initial conversation — send us a brief description of your project, and we'll send you a proposal that fits the scope and effort.

02 — Factors

What drives the price

  • Scope and number of integrations. Every additional system that needs to participate costs effort — regardless of how simple the core is.
  • State of your starting point. Clean data, existing content and documented processes significantly reduce effort. Chaos is the most expensive cost factor.
  • How much new material needs to be created. What you can contribute doesn't need to be invented by anyone. This is the biggest lever you have in your own hands.
  • Requirements for design and customization. A solid standard system costs a fraction of a custom solution — and is sufficient more often than vendors admit.
  • Operating model. One-time project costs or ongoing support: calculated over three years, this often gives a different picture than the quote comparison.

03 — Funding

Subsidies in Austria

For digitalization projects, there are several funding programs in Austria, such as KMU.DIGITAL or the aws digitalization funding. Whether and to what extent one of these is currently relevant for your project, we'll review with you individually. Current conditions: kmudigital.at, aws.at.

Which program is relevant, how high the subsidy currently is, and whether the budget for the current funding period is still open changes regularly — plus there are regional funding programs that vary by federal state. Only the information from the funding agencies themselves is reliable, not a fixed percentage stated here.

The most common mistake is always the same: commission first, then want funding. That doesn't work. Allow several weeks of lead time for application and approval.

04 — Scope

What's included

  • Assessment of existing processes — what actually happens today, not what's in the manual
  • Prioritization by time savings and error risk rather than technical feasibility
  • Implementation of automations with logging of every run
  • Error notification: If something stalls, you find out, not your customer
  • Documentation that someone who wasn't there also understands
  • Handover with training so you can make small changes yourself

05 — Questions

Frequently asked questions

What happens to the people who used to do this?

In practice, a position rarely disappears — the part of the work that nobody liked disappears. The time goes into things there was never time for before.

Are there subsidies for this?

For digitalization projects in Austria, there are several funding programs, such as KMU.DIGITAL or the aws digitalization funding (kmudigital.at, aws.at). Whether and to what extent this currently fits your situation, we check together — important: The application must be approved before the contract is awarded. Plan lead time for this.

What if our processes change?

Then the workflows are adjusted. We build them so that the variable parts — text blocks, recipients, thresholds — are in a table that you maintain yourself, without needing us.

How quickly does it pay off?

For the processes we typically start with, payback is between four and ten months. We calculate that before the quote, not after.

How do we know what's worth automating?

Rule of thumb: A process is worth it if it occurs at least weekly, has clear rules and is manual work today. In the current-state analysis, we calculate every candidate — frequency times duration times cost — and you decide based on numbers.

Do we have to buy new software for this?

Usually not. Most of it runs on the systems you already have, plus an automation layer. We only suggest new software if there's a real gap.

Do we lose control over our processes?

On the contrary: An automated process is fully documented and logged for the first time. You see every run. Before, only the person who always did it knew.

06 — Error

The most common mistakes

  • Starting too big. Projects where nobody can use anything for months fail more often than average. A small, usable first step is almost always the better way.
  • Not involving the people who work with it. Requirements that only come from management rarely match the actual work.
  • Not defining a success measure. Without a metric defined in advance, you can't say afterwards whether it delivered anything — and the next decision will be made on gut feeling again.
  • Overlooking operating costs. The project price is only part of it. What operation costs over three years belongs in the same calculation.
  • Creating dependency. If you don't get access, documentation and source code, you're locked in. That needs to be clarified before commissioning, not after.