Guide
What Does a Website Cost? Factors, Process, and Funding Options
There's no honest flat rate for having a website built — the projects behind them vary too much. What actually drives the effort, how you get to a concrete offer, and which subsidies are available in Austria.
A flat rate for a website can't honestly be stated — it depends on the scope of the project, not the provider. Typical range for a business site; one-pagers are cheaper, shops and portals are above that. The actual proposal comes only after a short, non-binding initial consultation.
01 — Price
What it costs
- Price
- Individual based on effort
- Typical duration
- 4 to 8 weeks
Typical range for a business site; one-pagers are cheaper, shops and portals are above that. A fixed price can only be stated honestly after the initial consultation — send us a brief description of your project and we'll send a proposal that fits the scope and effort.
02 — Factors
What drives the price
- Scope and number of integrations. Every additional system that needs to participate costs effort — regardless of how simple the core is.
- State of your starting point. Clean data, existing content and documented processes significantly reduce effort. Chaos is the most expensive cost factor.
- How much new material needs to be created. What you can contribute doesn't need to be invented by anyone. This is the biggest lever you have in your own hands.
- Requirements for design and customization. A solid standard system costs a fraction of a custom solution — and is sufficient more often than vendors admit.
- Operating model. One-time project costs or ongoing support: calculated over three years, this often gives a different picture than the quote comparison.
03 — Funding
Subsidies in Austria
For digitalization projects, there are several funding programs in Austria, such as KMU.DIGITAL or the aws digitalization funding. Whether and to what extent one of these is currently relevant for your project, we'll review with you individually. Current conditions: kmudigital.at, aws.at.
Which program is relevant, how high the subsidy currently is, and whether the budget for the current funding period is still open changes regularly — plus there are regional funding programs that vary by federal state. Only the information from the funding agencies themselves is reliable, not a fixed percentage stated here.
The most common mistake is always the same: commission first, then want funding. That doesn't work. Allow several weeks of lead time for application and approval.
04 — Scope
What's included
- Structure and copy based on what your customers actually search for
- Design in your corporate look, light and dark, without template appearance
- Technically sound: fast loading time, clean heading structure, structured data
- Accessibility according to WCAG 2.1 AA as standard, not as an extra charge
- Content management system so you can change content yourself
- Legal texts, cookie logic, and analytics set up in compliance with GDPR
05 — Questions
Frequently asked questions
What happens to our old site?
The content is carried over as long as it's suitable, and old addresses are redirected to the new ones. Without these redirects, you lose the visibility built up over years — that's the most common mistake in a relaunch.
Can we manage the site ourselves?
Yes. You maintain texts, images, and simple pages yourself. For structural changes you get in touch — or not, that's not a dependency we build.
Does our website have to be accessible?
Since 28 June 2025, the Accessibility Act (Barrierefreiheitsgesetz) applies in Austria. Mainly affected are online shops, bookings, e-ticketing, and banking services in consumer business; micro-enterprises are exempt for services. A pure information site generally doesn't fall under it — we still build to WCAG 2.1 AA because it makes the site better for everyone and the rules tend to get stricter.
What does ongoing operation cost?
Hosting, domain, updates, and backups are ongoing costs — how much depends on the size and requirements of the site, and we state that transparently in the quote. Anyone who skimps on that skimps until the first security incident.
Are there subsidies?
For digitalization projects in Austria, there are several funding programs, such as KMU.DIGITAL (kmudigital.at) or the aws digitalization subsidy (aws.at). Whether your project currently qualifies, we check individually — the application must be approved before awarding the contract in any case.
How long does it take?
Four to eight weeks is realistic if content and images arrive on time. The bottleneck is practically never development, but approval of texts and photos.
What does a website cost in Austria?
There's no serious way to answer that as a flat rate — the market ranges are huge because a one-pager and a multilingual company site with twenty pages are completely different projects technically. What matters most is how much content has to be created from scratch — that's almost always the biggest line item, not the technology. Send us a quick note about what you have in mind, and you'll get a proposal that fits your scope.
06 — Error
The most common mistakes
- Starting too big. Projects where nobody can use anything for months fail more often than average. A small, usable first step is almost always the better way.
- Not involving the people who work with it. Requirements that only come from management rarely match the actual work.
- Not defining a success measure. Without a metric defined in advance, you can't say afterwards whether it delivered anything — and the next decision will be made on gut feeling again.
- Overlooking operating costs. The project price is only part of it. What operation costs over three years belongs in the same calculation.
- Creating dependency. If you don't get access, documentation and source code, you're locked in. That needs to be clarified before commissioning, not after.
07 — Next
Related pages
- Having a website created — Overview
- Having a website created — Common mistakes
- Having a Website Built — Provider Comparison
- Having a website created — DIY
- Having a Website Built — Alternatives
- Having a Website Built — Process
- Having a website created — Where to start
- Having a Website Built — How It Works
- Landing page
- SEO
- Website relaunch
- All guides
Having a website created by region
Next step
We'll look at your starting position.
Tell us what's eating up time today. That becomes an assessment with effort and benefit — and only then an offer.